Tag: issues-old

Water Rights and Flows Protection in Texas

Since 1985, the Texas Commission on Environmental Quality and its predecessor agencies have included some level of environmental flow protections on new water rights. However, the level of protection varies widely from permit to permit, and unfortunately, over 90% of the water rights currently authorized were issued before 1985 and have no environmental conditions.

Read More »

Case Study: Proposed Marvin Nichols Reservoir

The proposed massive Marvin Nichols dam is a prime example of the unnecessary reliance on new reservoirs and pipelines instead of water conservation. This dam would create one of the largest reservoirs in Texas, flooding over 72,000 acres on the Sulphur River in rural Northeast Texas

Read More »

Exploring the surface water and groundwater connection

The interconnectivity of surface and groundwater supplies is well documented and understood. However, Texas water law generally fails to adequately recognize this concept, and the state’s planning and management strategies frequently treat groundwater and surface water separately.

Read More »

Steps to improve Texas water planning

The State Water Plan and water planning process do not fully take advantage of water conservation and drought response and fail to adequately address the needs of fish, wildlife, and the environment.

Read More »